South Fulton District Intersections
0
Share

Howell Ave Roadway Extension

BY | April 25, 2023
SFCID spacer

HOWELL AVE
ROADWAY EXTENSION

HOWELL AVE
ROADWAY EXTENSION

Completed in 2021, this roadway extension provides a new access point to the businesses on Bohannon Road on Howell Avenue at the intersection of Fairburn Industrial Boulevard/SR 74 to Bohannon Road, as well as additional routes to alleviate growing truck traffic in the area.

Completed in 2021, this roadway extension funded by the South Fulton CID adds an access point to the businesses on Bohannon Road, as well as additional routes to alleviate growing truck traffic in the area. This roadway in the City of Fairburn provides a connection between Howell Avenue at the intersection of Fairburn Industrial Blvd/SR 74 to Bohannon Road.

CID AT WORK

For more than two decades, the South Fulton CID’s property owners have led a multi-prong strategy to direct investments to the district. View our most recent projects.

COMPLETED

Bohannon Road Sidewalks

The South Fulton CID worked with the City of Fairburn to add sidewalks to Bohannon Road. The sidewalks will run from McLarin Road to Oakley Industrial Boulevard.

COMPLETED

MARTA Route 188

In April 2020, MARTA began running a special service temporary bus route for Oakley Industrial Boulevard that has now been made permanent.

COMPLETED

Renaissance Parkway

The South Fulton CID-funded civil engineering design for an access road to relive more traffic from SR 74 and connect to the park and ride.

Sidewalks
0
Share

Bohannon Road Sidewalks

BY | April 25, 2023
SFCID spacer

BOHANNON ROAD
SIDEWALKS

BOHANNON ROAD
SIDEWALKS

The South Fulton CID worked with the City of Fairburn to add sidewalks to Bohannon Road. The sidewalks will run from McLarin Road to Oakley Industrial Boulevard.

The South Fulton CID is working with the City of Fairburn to add sidewalks to Bohannon Road. The sidewalks will run from McLarin Road to Oakley Industrial Boulevard.

Currently, workers traveling from the MARTA stop along Bohannon Road have to walk on the roadway or dirt shoulder for much of the corridor.

The design for the sidewalks is complete, and the project will be under construction in the coming months.

CID AT WORK

For more than two decades, the South Fulton CID’s property owners have led a multi-prong strategy to direct investments to the district. View our most recent projects.

COMPLETED

MARTA Route 188

In April 2020, MARTA began running a special service temporary bus route for Oakley Industrial Boulevard that has now been made permanent.

COMPLETED

Renaissance Parkway

The South Fulton CID-funded civil engineering design for an access road to relive more traffic from SR 74 and connect to the park and ride.

COMPLETED

Multi-Modal Transportation Plan

The South Fulton CID finished a Multi-Modal Transportation Plan to understand how the CIDs transportation infrastructure is being used for the handling of freight and local resident and commuter mobility.

OIB MARTA Park and Ride Stop
0
Share

MARTA Route 188

BY | April 25, 2023
SFCID spacer

MARTA
ROUTE 188

MARTA
ROUTE 188

In April 2020, MARTA began running a special service temporary bus route for Oakley Industrial Boulevard that has now been made permanent. The route connects essential staff who work along Oakley Industrial Boulevard with MARTA’s College Park station, the SR 74 Park and Ride, and several stops along the boulevard.

In April 2020, MARTA began running a special service temporary bus route for Oakley Industrial Boulevard that has now been made permanent. The route connects essential staff who work along Oakley Industrial Boulevard with MARTA’s College Park station, the SR 74 Park and Ride, and several stops along the boulevard.

CID AT WORK

For more than two decades, the South Fulton CID’s property owners have led a multi-prong strategy to direct investments to the district. View our most recent projects.

COMPLETED

Renaissance Parkway

The South Fulton CID-funded civil engineering design for an access road to relive more traffic from SR 74 and connect to the park and ride.

COMPLETED

Multi-Modal Transportation Plan

The South Fulton CID finished a Multi-Modal Transportation Plan to understand how the CIDs transportation infrastructure is being used for the handling of freight and local resident and commuter mobility.

COMPLETED

Fairburn Park and Ride

A 200-space park and ride on the southeast side of SR 74 under the GA Power Lines that offers carpool and vanpool parking.

Road
0
Share

Renaissance Parkway

BY | April 25, 2023
SFCID spacer

RENAISSANCE
PARKWAY

RENAISSANCE
PARKWAY

The South Fulton CID-funded civil engineering design for an access road to relive more traffic from SR 74 and connect to the park and ride.

The SFCID funded civil engineering design for an access road to relive more traffic from SR 74 and connect to the park and ride. The project included a 3-lane commercial access road with curb and gutter, sidewalks on both sides of roadway, lighting, storm drain system, and 80’ right-of-way from the existing dead end.

CID AT WORK

For more than two decades, the South Fulton CID’s property owners have led a multi-prong strategy to direct investments to the district. View our most recent projects.

COMPLETED

Multi-Modal Transportation Plan

The South Fulton CID finished a Multi-Modal Transportation Plan to understand how the CIDs transportation infrastructure is being used for the handling of freight and local resident and commuter mobility.

COMPLETED

Fairburn Park and Ride

A 200-space park and ride on the southeast side of SR 74 under the GA Power Lines that offers carpool and vanpool parking.

COMPLETED

Oakley Industrial Boulevard Upgrade

Oakley Industrial Boulevard was upgraded from SR 138 to Fayetteville Road.

South Fulton CID Multi-Modal Study
0
Share

Multi-Modal Transportation Plan

BY | April 25, 2023
SFCID spacer

MULTI-MODAL
TRANSPORTATION PLAN

MULTI-MODAL
TRANSPORTATION PLAN

The South Fulton CID finished a Multi-Modal Transportation Plan to understand how the CIDs transportation infrastructure is being used for the handling of freight and local resident and commuter mobility.

The South Fulton CID recently finished a Multi-Modal Transportation Study to understand how the CID’s transportation infrastructure is being used for the handling of freight and local resident and commuter mobility. The purpose of the Plan is to develop and prioritize multi-modal transportation solutions within the study area.

CID AT WORK

For more than two decades, the South Fulton CID’s property owners have led a multi-prong strategy to direct investments to the district. View our most recent projects.

COMPLETED

Fairburn Park and Ride

A 200-space park and ride on the southeast side of SR 74 under the GA Power Lines that offers carpool and vanpool parking.

COMPLETED

Oakley Industrial Boulevard Upgrade

Oakley Industrial Boulevard was upgraded from SR 138 to Fayetteville Road.

Fairburn Park and Ride
0
Share

Fairburn Park and Ride

BY | April 25, 2023
SFCID spacer

FAIRBURN
PARK AND RIDE

FAIRBURN
PARK AND RIDE

A 200-space park and ride on the southeast side of SR 74 under the GA Power Lines that offers carpool and vanpool parking.

The 200-space park and ride is located on the southeast side of SR 74 under the GA Power Lines and serves carpool and vanpool commuters. The park and ride is situated to relieve traffic at peak hours. Future expansions will include bus pull outs and shelters. View the Fairburn Park & Ride fact sheet.

CID AT WORK

For more than two decades, the South Fulton CID’s property owners have led a multi-prong strategy to direct investments to the district. View our most recent projects.

COMPLETED

Oakley Industrial Boulevard Upgrade

Oakley Industrial Boulevard was upgraded from SR 138 to Fayetteville Road.

Oakley Industrial Boulevard
0
Share

Oakley Industrial Boulevard Upgrade

BY | April 25, 2023
SFCID spacer

OAKLEY INDUSTRIAL
BOULEVARD UPGRADE

OAKLEY INDUSTRIAL
BOULEVARD UPGRADE

Oakley Industrial Boulevard was upgraded from SR 138 to Fayetteville Road.

Oakley Industrial Boulevard was upgraded from SR 138 to Fayetteville Road. The project length is approximately 1.75 miles on Oakley Industrial and includes the intersections with SR 138. It was completed in Sept/Oct 2015 and construction costs totaled $4.1M.

CID AT WORK

For more than two decades, the South Fulton CID’s property owners have led a multi-prong strategy to direct investments to the district. View our most recent projects.