This roadway extension provides a new access point to the businesses as well as additional routes to alleviate growing truck traffic in the area.
The SFCID funded civil engineering design for an access road to relive more traffic from SR 74 and connect to the park and ride. The project included a 3-lane commercial access road with curb and gutter, sidewalks on both sides of roadway, lighting, storm drain system, and 80’ right-of-way from the existing dead end.