The South Fulton Community Improvement District (South Fulton CID) projects enhance mobility and safety through the improvement of existing transportation infrastructure for those who work, reside, and visit the South Fulton CID area.

PROJECTS UNDERWAY

UNDERWAY

Quick Response Projects (Annual Small Grants Fund)

The South Fulton CID coordinates quick,responsive projects to close transportation gaps. See the latest efforts underway in the district.

UNDERWAY

SR 74 at I-85 Interchange Reconstruction

The interchange is a gateway to one of the largest southeastern logistics corridors and SR 74 is a significant commuting corridor for Fayette County.

UNDERWAY

Pedestrian Bridge across CSX RR Tracks and US 29

The South Fulton CID and City of Fairburn are planning a pedestrian bridge to create a safer crossing for transit riders who are trying to access their jobs along Bohannon Road and Logistics Center Drive.

UNDERWAY

Oakley Industrial Boulevard Extension

Based on multimodal study, Oakley Industrial Boulevard is being improved and extended south beyond Creekwood, towards Gullatt Road.

UNDERWAY

Gullatt Road at I-85 Interchange

This project is currently being advanced, in partnership with GDOT, to the preparation of an Interchange Justification Report (IJR).

UNDERWAY

Gullatt Road Reclamation

This reclamation project on Gullatt Road will help the longevitity of the corridor, due to the high amount of truck traffic.

UNDERWAY

Freight Intelligent Transportation System

The South Fulton CID is working on a group of projects to support an intelligent transportation system (ITS).

RECENTLY COMPLETED

COMPLETED

Howell Ave Roadway Extension

This roadway extension provides a new access point to the businesses as well as additional routes to alleviate growing truck traffic in the area.

COMPLETED

Bohannon Road Sidewalks

The South Fulton CID worked with the City of Fairburn to add sidewalks to Bohannon Road. The sidewalks will run from McLarin Road to Oakley Industrial Boulevard.

COMPLETED

MARTA Route 188

In April 2020, MARTA began running a special service temporary bus route for Oakley Industrial Boulevard that has now been made permanent.

COMPLETED

Renaissance Parkway

The South Fulton CID-funded civil engineering design for an access road to relive more traffic from SR 74 and connect to the park and ride.

COMPLETED

Multi-Modal Transportation Plan

The South Fulton CID finished a Multi-Modal Transportation Plan to understand how the CIDs transportation infrastructure is being used for the handling of freight and local resident and commuter mobility.

COMPLETED

Fairburn Park and Ride

A 200-space park and ride on the southeast side of SR 74 under the GA Power Lines that offers carpool and vanpool parking.

COMPLETED

Oakley Industrial Boulevard Upgrade

Oakley Industrial Boulevard was upgraded from SR 138 to Fayetteville Road.